Propuesta de implementación de un sistema SCADA bajo la normativa IEC 61850 para la observación remota de la bahía de la subestación Porotillos

Para citar o enlazar este item, por favor use el siguiente identificador: http://dspace.ups.edu.ec/handle/123456789/32292
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorQuizhpi Palomeque, Flavio Alfredo-
dc.contributor.authorValencia Maldonado, Jorge Alexander-
dc.contributor.authorSaca Segovia, Joffre Alesandro-
dc.date.accessioned2026-03-10T22:41:14Z-
dc.date.available2026-03-10T22:41:14Z-
dc.date.issued2026-02-
dc.identifier.urihttp://dspace.ups.edu.ec/handle/123456789/32292-
dc.descriptionLa digitalización de subestaciones eléctricas basada en el estándar IEC 61850 exige sistemas SCADA con alta interoperabilidad, rapidez y confiabilidad. Este proyecto desarrolla e implementa un sistema SCADA para la bahía de energización Porotillos, integrando IEDs mediante comunicaciones IEC 61850 y validándolo mediante pruebas en laboratorio en la Universidad Politécnica Salesiana. La metodología incluyó el diseño de la arquitectura de comunicaciones, la configuración de señales lógicas entre IEDs y su integración al SCADA para supervisión y control. Se realizaron pruebas bajo condiciones normales y de falla, verificando la correcta transmisión de señales y la respuesta de protección. Los resultados confirmaron una comunicación efectiva y un funcionamiento confiable del sistema ante eventos simulados, concluyendo que la arquitectura implementada cumple con los requerimientos de una subestación digital moderna y permite futuras mejoras en redundancia y alta disponibilidad.spa
dc.description.abstractThe digitalization of electrical substations based on the IEC 61850 standard requires SCADA systems with high interoperability, speed, and reliability. This project develops and implements a SCADA system for the Porotillos energization bay, integrating Intelligent Electronic Devices (IEDs) through IEC 61850 communications and validating its performance through laboratory testing at Universidad Politécnica Salesiana. The methodology included the design of the communication architecture, the configuration of logical signals between IEDs, and their integration into the SCADA system for supervision and control. Functional tests were conducted under normal and fault conditions to verify correct signal transmission and protection response. The results confirmed effective communication and reliable system performance under simulated protection events. It is concluded that the implemented architecture meets the functional and operational requirements of a modern digital substation and provides a solid foundation for future improvements focused on redundancy and high availability.spa
dc.language.isospaspa
dc.rightsopenAccessspa
dc.subjectELECTRICIDADspa
dc.subjectSCADA (PROGRAMA PARA COMPUTADOR)spa
dc.subjectSUBESTACIONES ELÉCTRICAS-
dc.subjectINTERACCIÓN HOMBRE-COMPUTADOR-
dc.subjectDISPOSITIVOS LÓGICOS-
dc.titlePropuesta de implementación de un sistema SCADA bajo la normativa IEC 61850 para la observación remota de la bahía de la subestación Porotillosspa
dc.typebachelorThesisspa
ups.carreraElectricidadspa
ups.sedeSede Cuencaspa
Pertenece a las colecciones: Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UPS-CT012646.pdfTexto completo17,95 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.