Desarrollo y validación experimental de un modelo de digitalización de subestaciones basado en IEC 61850.

Para citar o enlazar este item, por favor use el siguiente identificador: http://dspace.ups.edu.ec/handle/123456789/32289
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorQuizhpi Palomeque, Flavio Alfredo-
dc.contributor.authorYunga Guamán, Jonnathan David-
dc.contributor.authorAuquilla Guamán, Andrés Eduardo-
dc.date.accessioned2026-03-10T22:01:56Z-
dc.date.available2026-03-10T22:01:56Z-
dc.date.issued2026-02-
dc.identifier.urihttp://dspace.ups.edu.ec/handle/123456789/32289-
dc.descriptionSe implementó en laboratorio un entorno experimental para digitalización de subestaciones conforme IEC 61850, con el caso Catamayo–Velacruz–Equasol. La solución se organizó por niveles de bahía y estación e integró IEC 61850-8-1: MMS para supervisión y GOOSE para intercambio rápido entre IEDs. Las funciones ANSI de sobrecorriente y distancia se definieron a partir del modelo en DIgSILENT PowerFactory y se cargaron en relés Siemens 7SA86 y 7SJ85 mediante DIGSI 5. La validación, con Omicron CMC 356 y Test Universe, comprobó respuesta de protección y tiempos de operación ante fallas monofásicas y trifásicas, además de la visualización de eventos en SCADA y la medición de latencia GOOSE con Wireshark. No se realizaron pruebas de Sampled Values por limitaciones de hardware. El trabajo evidencia aplicabilidad y beneficios de flexibilidad y menor cableado, sujetos a equipamiento compatible.spa
dc.description.abstractAn experimental laboratory setup was implemented to support substation digitalization in accordance with IEC 61850, using the Catamayo–Velacruz–Equasol scheme as a case study. The solution was structured into bay and station levels and integrated IEC 61850-8-1 communications: MMS for supervision and GOOSE for fast signal exchange among IEDs. ANSI overcurrent and distance protection functions were defined from the DIgSILENT PowerFactory electrical model and deployed on Siemens 7SA86 and 7SJ85 relays using DIGSI 5. Validation with the Omicron CMC 356 and Test Universe confirmed protection performance and operating times under single-phase and three-phase faults, as well as event and status visualization in a SCADA system and GOOSE latency measurements using Wireshark. Sampled Values testing could not be performed due to hardware limitations. Overall, the results demonstrate the applicability of IEC 61850 in distribution scenarios and highlight benefits such as greater engineering flexibility and reduced physical interconnections, subject to the availability of compatible equipment.spa
dc.language.isospaspa
dc.rightsopenAccessspa
dc.subjectELECTRICIDADspa
dc.subjectSUBESTACIONES ELÉCTRICASspa
dc.subjectDIGITALIZACIÓNspa
dc.subjectAUTOMATIZACIÓN-
dc.subjectREDES ELÉCTRICAS-
dc.subjectSCADA (PROGRAMA PARA COMPUTADOR)-
dc.titleDesarrollo y validación experimental de un modelo de digitalización de subestaciones basado en IEC 61850.spa
dc.typebachelorThesisspa
ups.carreraElectricidadspa
ups.sedeSede Cuencaspa
Pertenece a las colecciones: Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UPS-CT012644.pdfTexto completo12,97 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.