Buscar por Autor Jaramillo Segarra, Diego Andrés

Ir a: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
O introducir las primeras letras:  
Mostrando resultados 1 a 1 de 1
Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
Jaramillo Segarra, Diego Andrés (jun-2011) - [Director: Santos Narváez, Benigno Ignacio]
Demand grows in Ecuador between 5% and 7% per year, to cover this growth need new generation projects and new transmission projects. The bigger project in Ecuador will be the Coca Codo Sinclair with 1500 MW of power, this ability will be transmitted to the big load center that is Quito by the...