Modernización y automatización de la subestación Gonzanamá perteneciente al sistema eléctrico de potencia par la Empresa Eléctrica Regional del Sur S.A. (Loja)

Para citar o enlazar este item, por favor use el siguiente identificador: http://dspace.ups.edu.ec/handle/123456789/4791
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorGuillén Coello, Hernán Patricio-
dc.contributor.authorChuncho Morales, Juan Carlos-
dc.date.accessioned2013-07-08T16:10:58Z-
dc.date.available2013-07-08T16:10:58Z-
dc.date.issued2013-06-
dc.identifier.urihttps://dspace.ups.edu.ec/handle/123456789/4791-
dc.descriptionEn la subestación Gonzanamá, existían dos líneas de entrada a 69kV y la alimentación al transformador, que no disponían de interruptores, únicamente existían seccionadores fusible para su operación y protección. Las salidas de media tensión disponían de reconectadores electromecánicos de operación manual. En la modernización de la subestación se implementaron interruptores en SF6 en cada una de las líneas de 69kV con seccionadores de línea con puesta a tierra y de barra, incluida la alimentación al transformador. En las líneas de 13,8kV se implementaron reconectadores electrónicos con sus respectivos seccionadores de operación y bypass. Todos los elementos de operación y maniobra permiten mando remoto a través del SCADA de la Empresa Eléctrica. Se digitalizaron los planos que permitieron la intervención en la modernización de la subestación. En el diagrama de operación de cada elemento se realizaron ajustes al diseño, en base a las necesidades de la subestación; además, se realizó una distribución de borneras adecuada, tomando en cuenta las borneras propias de cada elemento. Finalmente, previo a la implementación del sistema inteligente se realizaron pruebas de funcionamiento de la RTU (Unidad Terminal Remota).en_ES
dc.description.abstractAt the substation Gonzanamá, there were two input lines to 69kV and power to the transformer, which did not have switches; fuse disconnectors existed only for operation and protection. The average output voltage reclosers possessed manually operated electromechanical. In the modernization of the substation SF6 switches were implemented in each of the lines with isolators 69kV grounded line and bar, including the power to the transformer. At 13.8 kV lines were implemented electronic reclosers with their operation and bypass breakers. All operating elements allow remote control and maneuver through the Utility SCADA. Planes were digitized intervention allowed the modernization of the substation. In the diagram of operation of each element in the design adjustments were made based on the needs of the substation; also underwent adequate distribution terminal blocks, taking into account the terminal blocks of each element. Finally, prior to the implementation of intelligent function tests were performed in the RTU (Remote Terminal Units).en_ES
dc.formatapplication/pdf
dc.language.isospaen_ES
dc.rightsopenAccess
dc.subjectSUBESTACIONES ELÉCTRICAS - GONZANAMÁ (LOJA, ECUADOR)en_ES
dc.subjectEMPRESAS ELÉCTRICASen_ES
dc.subjectDISTRIBUCIÓN DE ENERGÍA ELÉCTRICA - MEDIDAS DE SEGURIDADen_ES
dc.subjectSISTEMA DE INTERCONEXIÓN ELÉCTRICA - AUTOMATIZACIÓNen_ES
dc.titleModernización y automatización de la subestación Gonzanamá perteneciente al sistema eléctrico de potencia par la Empresa Eléctrica Regional del Sur S.A. (Loja)en_ES
dc.typebachelorThesisen_ES
ups.carreraIngeniería Eléctrica-
ups.sedeSede Cuenca-
Pertenece a las colecciones: Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UPS-CT002643.pdfTexto completo2,81 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons