Estudio de subestación eléctrica de 69KV / 13.8 KV / 5MVA de aislamiento tipo AIS para un complejo deportivo

Para citar o enlazar este item, por favor use el siguiente identificador: http://dspace.ups.edu.ec/handle/123456789/29794
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorAstudillo Astudillo, Otto Washington-
dc.contributor.authorMarín García, Ismael Octavio-
dc.contributor.authorMariño Aguirre, Jaysson Marcelo-
dc.date.accessioned2025-03-07T17:29:46Z-
dc.date.available2025-03-07T17:29:46Z-
dc.date.issued2025-
dc.identifier.urihttp://dspace.ups.edu.ec/handle/123456789/29794-
dc.descriptionEl presente trabajo consiste en un estudio de diseño de una subestación eléctrica de 69kV/13.8 kV con un transformador de potencia de 5 MVA para un complejo deportivo ubicado en la ciudad de Guayaquil, provincia del Guayas en Ecuador provincias del Guayas en la ciudad de Guayaquil sector Sur Oeste. El estudio considerara la carga total de demanda de energía eléctrica del complejo deportivo tanto en nivel de 69 kV como en 13.8kV. Con la carga de energía eléctrica una vez conocida por el complejo deportivo se determinará la distancia y el recorrido de la acometida en 69 kV los cálculos para el dimensionamiento de los equipos que conforman la subestación eléctrica y sus alimentadores acogiéndose a las normas establecidas por el ARCERNNR (Agencia de Regulación y Control de Energía y Recursos no Renovables). Se realizará la simulación de cortocircuitó a través del software DigSILENT para verificar los valores que nos lleven al correcto funcionamiento cumpliendo los establecido por la empresa distribuidora de energía (Corporación Nacional de Electricidad Cnel EP - Unidad de Negocios Guayaquil.spa
dc.description.abstractThe present work consists of a design study for a 69kV/13.8 kV electrical substation with a 5 MVA power transformer for a sports complex located in the city of Guayaquil, in the Guayas province of Ecuador, specifically in the southwestern sector of Guayaquil. The study will consider the total energy demand load of the sports complex at both 69 kV and 13.8 kV levels. Once the energy demand load for the sports complex is determined, the distance and route of the 69 kV feeder line will be established, along with the calculations for sizing the equipment that makes up the electrical substation and its feeders, adhering to the standards set by the ARCERNNR (Regulatory and Control Agency for Energy and Non-Renewable Resources). A short-circuit simulation will be carried out using DigSILENT software to verify the values that ensure proper operation, in compliance with the requirements established by the energy distribution company (Corporación Nacional de Electricidad Cnel EP - Guayaquil Business Unit).spa
dc.language.isospaspa
dc.rightsopenAccessspa
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Ecuador*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/ec/*
dc.subjectDIGSILENTspa
dc.subjectAUTOCADspa
dc.subjectIEEEspa
dc.subjectCENACEspa
dc.subjectCELEC EPspa
dc.subjectCNEL EPspa
dc.titleEstudio de subestación eléctrica de 69KV / 13.8 KV / 5MVA de aislamiento tipo AIS para un complejo deportivospa
dc.typebachelorThesisspa
ups.carreraElectricidadspa
ups.sedeSede Guayaquilspa
Pertenece a las colecciones: Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UPS-GT006048.pdfTexto Completo4,59 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons