Diseño de la captación y línea de conducción en la Comuna Santa Clara de San Millán perteneciente al Distrito Metropolitano de Quito

Para citar o enlazar este item, por favor use el siguiente identificador: http://dspace.ups.edu.ec/handle/123456789/20495
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSoria Pugo, María Gabriela-
dc.contributor.authorAguilar Jaramillo, Evelin Johanna-
dc.contributor.authorBunces Otáñez, Javier Sebastián-
dc.date.accessioned2021-07-20T17:55:36Z-
dc.date.available2021-07-20T17:55:36Z-
dc.date.issued2021-07-
dc.identifier.urihttp://dspace.ups.edu.ec/handle/123456789/20495-
dc.descriptionEl presente trabajo de titulación tiene como objetivo el diseño de una obra de captación y línea de conducción en etapa de prefactibilidad para la Comuna Santa Clara de San Millán que satisfagan las necesidades de esta, y a su vez cumpla con los requerimientos en normativa y reemplace el sistema existente, dichos diseños se realizaron para una vida útil de 30 años. La infraestructura actual no se encuentra en óptimas condiciones debido a que ha cumplido su vida útil y fue construida de manera empírica. Se realizaron encuestas, levantamiento topográfico, aforos volumétricos, análisis económico, entre otros. Se proponen dos alternativas de diseño, donde la más viable fue seleccionada mediante un análisis técnico y económico, esta comprende una captación de ladera, línea de conducción, tanques rompe-presión. Estos componentes fueron diseñados en conformidad a la normativa ecuatoriana para sistemas de abastecimiento de agua potable (CO 10.07 – 601). Dentro del alcance del proyecto se contempló la entrega de diferentes documentos de ingeniería, tales como: planos de la alternativa seleccionada, documentación técnica, especificaciones técnicas, precios unitarios, plan ambiental.spa
dc.description.abstractThe objective of this degree work is to design a catchment and pipeline work in the pre-feasibility stage for the Comuna Santa Clara de San Millán that satisfies the needs of this, and in turn complies with the requirements in regulations and replaces the existing system, these designs were made for a useful life of 30 years. The current infrastructure is not in optimal condition because it has reached its useful life and was built empirically. Surveys, topographic survey, volumetric gauges, economic analysis, among others, were carried out. Two design alternatives are proposed, where the most viable one was selected through a technical and economic analysis, this includes a slope catchment, conduction line, pressure-break tanks. These components were designed in accordance with the Ecuadorian regulations for drinking water supply systems (CO 10.07 – 601). Within the scope of the project, the delivery of different engineering documents was contemplated, such as: drawings of the selected alternative, technical documentation, technical specifications, unit prices, environmental plan.spa
dc.language.isospaspa
dc.rightsopenAccessspa
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Ecuador*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/ec/*
dc.subjectINGENIERÍA CIVILspa
dc.subjectDISEÑO ESTRUCTURALspa
dc.subjectESTRUCTURAS HIDRÁULICASspa
dc.subjectINGENIERÍA DEL ABASTECIMIENTO DE AGUAspa
dc.subjectDESARROLLO DE RECURSOS HÍDRICOSspa
dc.titleDiseño de la captación y línea de conducción en la Comuna Santa Clara de San Millán perteneciente al Distrito Metropolitano de Quitospa
dc.typebachelorThesisspa
ups.carreraIngeniería Civilspa
ups.sedeSede Quitospa
Pertenece a las colecciones: Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UPS - TTS386.pdfTexto completo11,5 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons