Estimación de costos de la energía eléctrica no utilizada en micro-redes mediante métodos estocásticos basado en árboles de decisión

Para citar o enlazar este item, por favor use el siguiente identificador: http://dspace.ups.edu.ec/handle/123456789/19832
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorGarcía Torres, Edwin Marcelo-
dc.contributor.authorLarco Rodríguez, Galo Alexander-
dc.date.accessioned2021-02-26T03:54:30Z-
dc.date.available2021-02-26T03:54:30Z-
dc.date.issued2021-02-
dc.identifier.urihttp://dspace.ups.edu.ec/handle/123456789/19832-
dc.descriptionEl crecimiento de la población y el desarrollo industrial a obligado a un aumento en la demanda de energía, lo que a obligado a las empresas generadoras de energía a incrementar su infraestructura de producción de energía, la cual es muy costosa, por lo que se busca implementar políticas para atender la demanda, incluida la generación distribuida (GD). De esta forma, se consigue un consumo de energía más eficiente, porque la carga que no representa el tiempo de consumo máximo de energía se puede transferir a otros períodos de tiempo. Además, se puede implementar un sistema de gestión energética (GE), es decir, la estrategia de formular un plan óptimo de consumo energético y aplicarlo a toda la industria o al sistema eléctrico completo ayudará a la empresa a mejorar su competitividad porque tiene más eficiencia. Este documento plantea estimar los costos de la energía no utilizada en una micro-red aislada, utilizando programas de respuesta de la demanda para lo cual se va analizar el comportamiento de la demanda en dicha micro-red para posteriormente estimar los costos asociados de la energía no utilizada y para finalmente implementar precios mediante procesos estocásticos a los usuarios de la micro-red y venta de energía.spa
dc.description.abstractPopulation growth and industrial development have forced an increase in energy demand, forcing energygenerating enterprises to increase their very expensive energy production infrastructure, Therefore, it seeks to implement policies to meet demand, including distributed generation (GD). In this way, a more efficient energy consumption is achieved, because the load that does not represent the maximum energy consumption time can be transferred to other periods of time. In addition, an energy management system (GE) can be implemented, that is, the strategy of formulating an optimal energy consumption plan and applying it to the entire industry or to the entire electrical system will help the company to improve its competitiveness because it has more efficiency. This document proposes to estimate the costs of energy not used in a micro-grid order to assess the behaviour of demand in the micro-grid, to estimate the associated costs of unused energy and finally to implement prices through stochastic processes users of the micro-network and sale of energyspa
dc.language.isospaspa
dc.rightsopenAccessspa
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Ecuador*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/ec/*
dc.subjectINGENIERÍA ELÉCTRICAspa
dc.subjectESTIMACIÓN DE COSTOspa
dc.subjectENERGÍA ELÉCTRICAspa
dc.subjectREDES ELÉCTRICASspa
dc.subjectPROCESOS ESTOCÁSTICOSspa
dc.subjectFUENTES DE ENERGÍAspa
dc.titleEstimación de costos de la energía eléctrica no utilizada en micro-redes mediante métodos estocásticos basado en árboles de decisiónspa
dc.typebachelorThesisspa
ups.carreraIngeniería Eléctricaspa
ups.sedeSede Quitospa
Pertenece a las colecciones: Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UPS - TTS261.pdfTexto completo1,35 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons