Análisis de transitorios hidráulicos incorporando elementos disipadores de energía para disminuir la sobrepresión en la tubería a presión de la Central Hidroeléctrica Pusuno I

Para citar o enlazar este item, por favor use el siguiente identificador: http://dspace.ups.edu.ec/handle/123456789/20750
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorRodríguez Badillo, Freddy Israel-
dc.contributor.authorZabala Tabango, Josué David-
dc.date.accessioned2021-08-24T15:33:29Z-
dc.date.available2021-08-24T15:33:29Z-
dc.date.issued2021-08-
dc.identifier.urihttp://dspace.ups.edu.ec/handle/123456789/20750-
dc.descriptionLa Empresa Elit Energy se encuentran a cargo de la administración y operación de la central hidroeléctrica Pusuno I, la misma que ha manejado ciertas complicaciones en el sistema hidráulico a presión, especialmente en la tubería a presión que es la encargada de suministrar un caudal de 12 m3/s a dos unidades de generación (turbinas Francis) respectivamente. Las complicaciones que se han evidenciado en la tubería de (Poliéster Reforzado de Fibra de Vidrio) PRFV o GRP por sus siglas en inglés (Glass Reinforced Plastic) de presión , ha sido el fallo en sus conexiones en donde se ha planteado dar una solución breve mediante un reforzamiento con hormigón en cada junta fallada. Se presume que el origen de este problema es por alguna complicación que se obtuvo durante el proceso de transporte e instalación debido a que la tubería es susceptible a los impactos. Por lo tanto, este proyecto de titulación tiene como objetivo dar una solución mediante la selección de una alternativa disipadora de presiones (válvula de alivio de paso anular, válvula anticipadora de golpe de ariete, 1 tanque hidroneumático y 2tanque hidroneumáticos) que permita reducir la sobrepresión generada en el sistema hidráulico durante la presencia de los fenómenos de los transitorios hidráulicos con el propósito de salvaguardad la integridad física de la tubería y mantener el tiempo de vida útil de la misma. Para este análisis de los transitorios hidráulicos se utilizó el paquete informático Bentley Hammer V8i, permitiendo plantear una solución a los problemas que están surgiendo en la tubería de la central hidroeléctrica Pusuno I durante los escenarios de operación normal y extraordinarios. El resultado obtenido de este análisis puede ser tomado en cuenta por Elit Energy como una propuesta de solución.spa
dc.description.abstractThe Elit Energy Company is in charge of the administration and operation of the Pusuno I hydroelectric plant, which has managed complications complications in the pressure hydraulic system, especially in the pressure pipeline that is responsible for supplying a flow of 12 m3 / s at two generation units (Francis turbines) respectively. The complications that have been evidenced in the pressure pipe of PRFV o GRP, has been the failure in its connections where it has been proposed to give a brief solution through a reinforcement with concrete in each failed joint. It is presumed that the origin of this problem is due to some complication that was obtained during the transportation and installation process because the pipe is susceptible to impacts. There fore, this degree project aims to provide a solution through the selection of a pressure dissipating alternative (annular relief valve, water hammer anticipatory valve, 1 hydro-pneumatic tank and 2 hydro pneumatic tanks) that allows reducing overpressure generated in the hydraulic system during the presence of hydraulic transient phenomena in order to safeguard the physical integrity of the pipeline and maintain its useful life. For this analysis of the hydraulic transients, the Bentley Hammer V8i software package was used, allowing to propose a solution to the problems that are arising in the pipeline of the Pusuno hydroelectric power plant during normal and extraordinary operating scenarios. The result obtained from this analysis can be considered by Elit Energy as a solution proposal.spa
dc.language.isospaspa
dc.rightsopenAccessspa
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Ecuador*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/ec/*
dc.subjectINGENIERÍA CIVILspa
dc.subjectANÁLISIS FUNCIONALspa
dc.subjectESTRUCTURAS HIDRÁULICASspa
dc.subjectFENÓMENOS TRANSITORIOS (DINÁMICA)spa
dc.subjectFUERZA Y ENERGÍAspa
dc.subjectPRESIÓNspa
dc.subjectTUBERÍASspa
dc.subjectCENTRALES HIDROELÉCTRICASspa
dc.titleAnálisis de transitorios hidráulicos incorporando elementos disipadores de energía para disminuir la sobrepresión en la tubería a presión de la Central Hidroeléctrica Pusuno Ispa
dc.typebachelorThesisspa
ups.carreraIngeniería Civilspa
ups.sedeSede Quitospa
Pertenece a las colecciones: Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UPS - TTS465.pdfTexto completo7,17 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons