Óptima determinación de potencia para abastecer la demanda en el mediano plazo a través de subastas inversas de energía usando programación lineal (LP)
Para citar o enlazar este item, por favor use el siguiente identificador:
http://dspace.ups.edu.ec/handle/123456789/19172
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Muñoz Pilco, Jorge Paúl | - |
dc.contributor.author | Yánez Sánchez, Kevin Raúl | - |
dc.date.accessioned | 2020-09-16T05:55:33Z | - |
dc.date.available | 2020-09-16T05:55:33Z | - |
dc.date.issued | 2020-09 | - |
dc.identifier.uri | https://dspace.ups.edu.ec/handle/123456789/19172 | - |
dc.description | El abastecimiento de la demanda eléctrica es instantánea y surge automáticamente cuando lo requiere el consumidor; aspecto por el cual el parque generador debe estar listo para cumplir este requerimiento, sin embargo, una capacidad insuficiente de generación conlleva a la escasez, mientras que una capacidad excesiva de generación no aprovechada causa efectos negativos a nivel económico; por consiguiente es de gran importancia el establecimiento de mecanismos que permitan la incorporación optima de centrales de generación en base a la planificación a mediano plazo, pues las decisiones que se tomen implican la afectación de recursos, con posibles riesgos económicos para el usuario y la economía en general. En este sentido, el presente trabajo elabora un modelo de optimización el cual será resuelto mediante GAMS y determina, través de subastas de bloques de energía, la combinación de generadores que abastecerán la demanda en el mediano plazo, analizando como caso de estudio el sistema eléctrico ecuatoriano. | spa |
dc.description.abstract | The supply of electricity demand is instantaneous and automatically when required by the consumer; As a result, the generating park must be ready to meet this requirement. However, insufficient generation capacity leads to a shortage, while an excessively unused generation capacity causes negative economic effects; therefore, the establishment of mechanisms that enable the optimal incorporation of generation plants based on medium-term planning is of great importance, since the decisions taken imply the allocation of resources, with possible economic risks for the user and the economy. In this sense, this work elaborates an optimization model which will be solved by GAMS and determines, through energy block auctions, the combination of generators that will supply demand in the medium term, analyzing the Ecuadorian electrical system as a case study. | spa |
dc.language.iso | spa | spa |
dc.rights | openAccess | spa |
dc.rights | Atribución-NoComercial-SinDerivadas 3.0 Ecuador | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/ec/ | * |
dc.subject | INGENIERÍA ELÉCTRICA | spa |
dc.subject | ANÁLISIS DE REDES ELÉCTRICAS | spa |
dc.subject | ELECTRÓNICA DE POTENCIA | spa |
dc.subject | DISTRIBUCIÓN DE ENERGÍA ELÉCTRICA | spa |
dc.subject | PLANIFICACIÓN ESTRATÉGICA | spa |
dc.subject | ENERGÍA ELÉCTRICA | spa |
dc.subject | PROGRAMACIÓN LINEAL | spa |
dc.title | Óptima determinación de potencia para abastecer la demanda en el mediano plazo a través de subastas inversas de energía usando programación lineal (LP) | spa |
dc.type | bachelorThesis | spa |
ups.carrera | Ingeniería Eléctrica | spa |
ups.sede | Sede Quito | spa |
Pertenece a las colecciones: | Grado |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
UPS - TTS112.pdf | Texto completo | 1,14 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons