Configuración óptima de alimentadores y estudio de coordinación de protecciones de la subestación Sambocity de CNEL EP

Para citar o enlazar este item, por favor use el siguiente identificador: http://dspace.ups.edu.ec/handle/123456789/15140
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCárdenas Villacrés, David Humberto-
dc.contributor.authorValencia Sinza, Esteban David-
dc.contributor.authorPantaleón Iñiguez, Danny Michely-
dc.date.accessioned2018-02-16T18:40:35Z-
dc.date.available2018-02-16T18:40:35Z-
dc.date.issued2018-
dc.identifier.urihttps://dspace.ups.edu.ec/handle/123456789/15140-
dc.descriptionEn el presente trabajo se realiza la distribución de carga y el estudio de coordinación de protecciones de la Subestación Sambocity propiedad de la corporación nacional de electricidad CNEL EP, ubicada en el cantón Daule de la provincia del Guayas en el kilómetro 6 de la Av. León Febres Cordero. Tras realizar el levantamiento eléctrico de las redes de media tensión y recopilar los datos del sistema se procede a efectuar el análisis de flujo de potencia en condiciones actuales y futuras tanto en máxima y mínima demanda, lo cual proporcionara información relevante sobre los niveles de tensión en las barras, consumos y cargabilidad de los elementos del sistema, adicional se lleva acabo el análisis de cortocircuito en barra de 69kV y 13,8kV de la subestación proporcionando las corrientes de falla trifásica, línea-línea ,línea–línea-tierra, línea-tierra , lo cual servirá para realizar los ajustes y coordinación de protecciones de la subestación, todo esto mediante el Software ETAP, el cual permite realizar estudios de ingeniería a los sistemas eléctricos de potencia..en_US
dc.description.abstractThe present work performs the load distribution and the study of coordination of protections of the Sambocity Substation, owned by the national electrical corporation CNEL EP, located in the Daule canton of the province of Guayas at kilometer 6 of Av. León Febres Lamb. After carrying out the electrical survey of the medium voltage networks and collecting the system data, we proceed to carry out the power flow analysis in current and future conditions, both in maximum and minimum demand, which will provide us with relevant information on the voltage levels in the busbars, consumption and chargeability of the elements of the system, additional is carried out the short circuit analysis in bar of 69kV and 13.8kV of the substation providing the three-phase fault currents, line-line, line-line-ground, line - ground , which will serve to performs the adjustments and coordination of protections of the substation, all this through the ETAP Software.en_US
dc.language.isospaen_US
dc.rightsopenAccessen_US
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Ecuador*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/ec/*
dc.subjectSISTEMA ELÉCTRICOen_US
dc.subjectPROTECCIONES ELÉCTRICASen_US
dc.subjectFLUJO DE POTENCIAen_US
dc.subjectSOFTWARE ETAPen_US
dc.titleConfiguración óptima de alimentadores y estudio de coordinación de protecciones de la subestación Sambocity de CNEL EPen_US
dc.typebachelorThesisen_US
ups.carreraIngeniería Eléctrica-
ups.sedeSede Guayaquil-
Pertenece a las colecciones: Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UPS-GT002058.pdfTexto completo4,63 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons